The hero myths of eighties TV…

I’m not saying there’s a connection, but I grew up on the hero myths of The A-Team, MacGuyver, Ulysses 31 and Jayce and Wheeled Warriors where the only way for the heroes to get what they wanted was to help others along the way, and now I work in the charity sector.

I wonder what hero myths of today are affecting future generations of charity people.

How far upstream should charities operate?

If a charity working on reducing heart disease, for example, found that they could add a medication to the global water supply and completely eradicate heart disease from the human race, should they do it?

Ethics (not giving people a choice) and consequences (increasing the human population) aside, should they do it? I say these things aside because I’m interested in how far upstream charities could go to solve problems rather than whether they should.

It seems to me that most charities act on problems at a down-stream point closest to the impact, and not many take solutions upsteam to prevent the problem form happening. And from the charity’s point of view this makes sense, because how can you demonstrate the impact you’ve had on a problem that doesn’t exist because you’ve fixed it upstream? Better then, to have a problem that exists and support the people facing that problem.

Upstream problems require complex systems changes, and perhaps many charities feel unable to act in that space, or that it’s not their role to do so. I wonder if this is where charity innovation needs to go?

Planning work: top-down or bottom-up?

When planning work, should you start with the goal and break it down into chunks of work, or start with tasks and group them up into the goal?

Let’s say you’re working on a project, and you want to get an idea of all the tasks you need to complete in order to deliver the project so you can tell how long the project is going to take or whether it can be done by the deadline. How should you approach doing that?

Generally speaking, there are two ways; top-down planning or bottom-up planning.

Top-down planning

Example

We want to build a castle out of Lego. In order to do that we’ll need a design for the castle, get the Lego blocks to build it, find a space to work in, and get people to do the building. So, now we’ve broken the goal out into four different groups of work that will allow us to achieve it.

Next we’re going to break each of those down. The task of ‘designing the castle’ could be broken down into ‘design the turrets’, ‘design the drawbridge’, ‘design the courtyard’, etc., until we have a complete list of all of the parts of the castle that need to be designed. For the task of ‘get the bricks’, we could break it down into ‘get red bricks’, ‘get blue bricks’, etc. And we’d do the same for the other two groups of tasks.

Each of those tasks can then be broken down further, so ‘get red bricks’ is broken out into ‘get list of red bricks from designer’, ‘send list of red bricks to supplier’, and ‘count delivery of red bricks to check they are all there’.

Approach

Start with the biggest single thing you know about the project, which is usually it’s goal. What does the project need to deliver and by when (assuming it has a deadline)?

Then divide the goal into groupings of tasks. These groupings can be tasks themselves, e.g., ‘Design the castle’, ‘Build the castle’, or they can align with project teams, e.g., Designer, Builders, Estates, and HR., or they can be aligned with phases of the project lifecycle. The important part at this stage is to try to make the groupings large enough to encompass everything that is part of the project.

Then divide the larger tasks into smaller tasks, and those into even smaller tasks. Judging the level of fidelity to go to will depend on the complexity of the project but it should be to enable other project management tasks to be completed such as estimating time, understanding which tasks can be completed in parallel or in sequence, where people are needed, etc.

Reasoning

Top-down planning uses deductive reasoning. Deduction starts with the general and reduces it to the specific. The logic of deductive reasoning is “If A equals B, and B equals C, then A must equal C”. But it starts with an ‘if’. C only equals A if A really does equal B. If the first statement isn’t true then although the reasoning can be accurate the result can be completely wrong. Knowing what reasoning you are applying in planning is important for ensuring that the planning process is valid and reliable. If, part way through the deductive reasoning process of breaking down the general to the specific

Benefits

Deductive reasoning and top-down planning can work well when the goal or end state is well-known and clearly defined. If you are sure you want to build a castle then top-down planning can work well.

Can help to identify whether a project can be delivered by a deadline and understanding whether all of the tasks can be completed within the time frame.

Can be down to any degree of fidelity, with as many breakdowns as are required to understand the work of the project.

Disbenefits

Top-down planning relies on the initial assumptions being correct. The more assumptions that turn out not to be true as the project progresses, the more the plan deviates from reality and harder it is to know whether the project will be delivered on time.

Replanning, when something changes in the project, for example you get more builders or you realise you forgot to design the moat, is likely to affect the tasks in other groupings.

This approach relies on dividing the tasks but doesn’t provide any guidance on how to create the divisions or whether any divisions were missed.

It’s harder to see dependencies in other groups of tasks, and so unknown blockers can be created.

The more levels of task breakdown that are included in the plan, the more time and effort is required to create the plan.

Bottom-up planning

Example

We have lots of Lego but we don’t know what to build with it. So we start with the task, ‘Decide what to build’, and that makes us think that we need to know who we’re building for, so we add the tasks ‘Define target audience’ and ‘Survey target audience’. And these, along with the other related tasks we can think of, are grouped together.

Then we move on and think of the task ‘Organise the bricks’, which might go into the same grouping as the task, ‘Decide where to build’, either because its the same team working on it or we want to do the work for those tasks at the same time.

And once we have all the tasks grouped we can form an idea of the outcome of the project from bringing those groups together to see that we’ll be building a Lego spaceship.

Approach

Start with small tasks and group the similar or connected ones together. When a pattern emerges, then group those groups together. As other tasks are thought of they can either be added to an existing grouping or start a new one.

The project plan is complete when all the known tasks have been added, grouped, and together those groups become the project goal or output.

Reasoning

Bottom-up planning uses inductive reasoning which starts with the specific and makes broad generalisations based on the patterns that emerge from those specific observations.

The usually example is taking coins out of a purse. If all of the coins you’ve taken out have been ten pence pieces, then even though you haven’t taken all of the coins out of the purse you can reach the conclusion that all of the remaining coins in the purse are ten pence pieces.

This type of reasoning in planning is useful because it gives you a degree of control over when you recognise a pattern (after three coins or after 75% of coins) and the validity of your conclusion (once you’ve taken all of the coins out of the purse).

Benefits

The bottom-up approach to planning works well when the goal or end-state isn’t know and needs to emerge from the planning process.

It allows new tasks to be added and grouped appropriately, either in existing or new groups.

Disbenefits

This approach can make the project look unstructured as new groupings of tasks can emerge late into the project when they are thought of.

It doesn’t reveal the goal or end-state of the project until the planning is complete.

Inductive reasoning assumes that it’s conclusions, or in our case the groupings of tasks that make up the project plan, are correct, even if your validity is low. So, a project plan reached through inductive reasoning that was done without the input of your Lego designers wouldn’t recognise that you had a gap in the plan because there were no design tasks added in order to be grouped.

Is there another way?

Yes, we can use abductive reasoning. Abductive reasoning takes observations and evidence and uses them to reach the most likely explanation, or in the case of our Lego example says, based on the Lego blocks that we have and the skills of our builders it looks like we might be able to build a Lego car. Project planners aren’t usually very happy with ‘might be able to’ so you can see why this type of reasoning and approach to planning isn’t used very much. However, for situations where certainty about the outcome isn’t required an abductive approach can result in a more realistic plan as it is based on evidence rather than inference as with deductive and inductive reasoning.

What can go wrong?

Using an approach, either top-down or bottom-up, requires the right use of reasoning to go with it. If use a top-down planning method, but switch between deductive and inductive reasoning (probably without realising it) then our project plans can become very confused.

Hypothesis about innovation in the charity sector

A lack of a model for social innovation, and the dominant model of tech startup, results in charities focusing their innovation efforts on incremental improvements that enable the charity to do the same but better rather than attempting to solve problems in different ways.

Weeknotes #263

This week I did:

Show me the data

Spent some time this week working on data processes and understanding how and where data is collected, processed and stored to see if there is anything we can do to improve the consistency of collection and efficiency of processing without disrupting any existing processes that rely on the data. It could be someone’s life’s work to understand every piece of data from where it starts, where it goes, how it’s used. But not mine. I’ve developed a framework for how we understand different types of data and how the usage of the data defines how generic or specific it is, which helps us understand the best way to collect, process and store it. Given that it’s business critical data this whole piece of work needs greater robustness and consideration, so testing out my thinking by how well the framework (which is really just a visual representation of my thinking) communicates the context for what we design next is important.

Ahead of schedule and on target

I finished analysing the information I collected for my dissertation which puts me a week ahead of schedule. Next is writing a case study from the analysis that ‘builds theory’ around the innovation processes used in charities. And I scored 80 on my last exam (who knew I knew so much about Blockchain) which puts my overall score for the modules (which make up 40% of the overall grade) at 70.1. Right on target. Distinction with the least amount of effort.

Read and listened to this week:

Rethinking your position

The Knowledge Project podcast episode with Adam Grant is the kind of podcast episode you can listen to again and again to get the most out of it.

Charity innovation stuff

I’ve found lots of interesting papers on innovation and the charity sector which don’t fit with my dissertation but which I might come back to, so I’ve added them to the notes section of my website.

And thought about:

Top-down or bottom up?

What’s the best way to plan lots of pieces of work? Should you start at the top with a goal and work down defining the things you need to do to achieve the goal? Or should you start at the bottom with all the work you know about and build up into the categories where things naturally fit? Top-down applies a structure, bottom-up is more emergent. Top-down seems better for planning against external constraints like deadlines, bottom-up seems less likely to miss things and better at spotting connections and dependencies. Anyway, this is the planning tool I want.

How to compare things

We usually leap to doing the thing we need to do rather than figuring out the mental model or thinking process that we need to apply in order to do the thing effectively. Comparing things is an obvious case. We know we need to compare five similar things in order to pick the ‘best’, and we might have a vague, intuitive idea of what ‘best’ might look like based on experience, but we don’t really have any means to judge what makes one nearer to ‘best’ than another. Luckily, there are only two types of comparison to choose from: absolute or relative. Absolute has preset criteria to judge against. Relative compares one thing to another. If you were comparing dogs to see which was the most intelligent you would need an absolute definition for intelligence, and then whichever dog got closest would be the most intelligent. If you were comparing dogs to see which was the biggest, you would compare them relative to each other, you wouldn’t have an external criteria to judge them against. Choosing how to compare things before comparing helps to compare them in the right way.

Q4

My masters will be finished in September. Then what? What shall I do with everything I learned about innovation and how it’s used in the charity sector?

This week I’m grateful for:

Open-mindedness

The open and creative thinking of some of my colleagues as we’ve explored the way forward for projects. They’ve given me the space to work through my thinking about things rather than requiring the single right answer.

My growth area this week:

Always being right

I’ve started to realise how much I try to prove that I’m right. So, personal kaizen, what 1% improvement can I make on this? I’m going to start by trying to build my self-awareness of it, try to catch myself doing it, and maybe keep a note of the situations it occurs in, asking myself ‘What problem am I solving for this person?’, to help me understand if the stuff I’m saying is for them or for me.